ISSN print edition: 0366-6352
ISSN electronic edition: 1336-9075
Registr. No.: MK SR 9/7

Published monthly
 

Complex biogas membrane upgrading to BioCNG at agriculture biogas plant

Jiří Maršálek, Pavel Brož, and Marek Bobák

MemBrain s.r.o., Stráž pod Ralskem, Czech Republic

 

E-mail: jiri.marsalek@membrain.cz

Received: 13 March 2020  Accepted: 30 May 2020

Abstract:

Biogas upgrading in Czech Republic evinces very slow start, especially because of low foundation support. Distrust of biogas plant operators is caused mainly by high capital costs and further biomethane utilization. Cheap, small-scale demonstration units, which evince additional value, could present potential kick-off for following capacity increase in order to supply the gas into the grid or broaden insufficient net of dispensing gas stations to fuel CNG vehicles. In this article, we present our biogas upgrading pilot unit, which is long-term operated at agricultural biogas plant in Czech Republic. It presents a compact and complex system of biogas pretreatment, purification and BioCNG dispensation placed in one transportation container ISO 20. It processes 12 N m3/h of biogas while produces 6.3 N m3/h of biomethane (95–96 vol%) with overall methane recovery 83.9%. Acquired data confirm that any funding support makes small-scale upgrading profitable with acceptable return of investments.

Keywords: Biogas; Upgrading; Membrane separation; Pretreatment; BioCNG

Full paper is available at www.springerlink.com.

DOI: 10.1007/s11696-020-01238-7

 

Chemical Papers 74 (12) 4227–4239 (2020)

Wednesday, November 27, 2024

IMPACT FACTOR 2023
2.1
SCImago Journal Rank 2023
0.381
SEARCH
Advanced
VOLUMES
© 2024 Chemical Papers